Kazinex provides three view modes that control how the activities workspace is laid out. Switch between them using the three-button toggle in the top-right corner of the toolbar.

Available Modes

Grid Mode

Full-width data grid with no Gantt chart visible. This mode is best for:

  • Data-heavy analysis and bulk column review
  • Exporting tabular data
  • Working with many columns simultaneously
  • Quality score analysis with audit columns

The grid expands to fill the entire workspace width.

Split Mode (Default)

Grid and Gantt chart displayed side by side with a draggable divider. This is the default view and is best for:

  • General schedule review
  • Correlating bar positions with row data
  • Drag interactions (reschedule, progress updates)
  • Dependency line inspection

Divider behaviour:

ActionResult
Drag the centre dividerResize panes freely (minimum 260 px each side)
Double-click the dividerReset to the default 50/50 split

Both panes share a synchronised vertical scroll. Each pane has its own horizontal scrollbar.

Gantt Mode

Full-width Gantt chart with no grid columns. Best for:

  • Visual scheduling and presentation
  • Printing a Gantt-only layout
  • Large monitors or projector displays
  • Inspecting bar styles and dependency routing

The Gantt expands to fill the entire workspace width.

Switching Modes

Click one of the three buttons in the toolbar toggle:

ButtonModeKeyboard Shortcut
Grid iconGrid only
Split iconGrid + Gantt
Gantt iconGantt only

The switch is instant — no data reload occurs. Your column selections, grouping, and filter state are preserved across mode changes.

Mode Persistence

Your last-used view mode is saved per browser session. When you reopen the same schedule, Kazinex restores your preferred view mode automatically.

Tips

  • Use Grid mode when you need to see 15+ columns at once without horizontal scrolling.
  • Use Split mode when reviewing critical path logic — you can click an activity in the grid and see its bar highlighted in the Gantt.
  • Use Gantt mode for stakeholder presentations or when printing a visual schedule.