Navigation & Zoom

Available in: All plans
Last updated: 05-Mar-2026

Overview

The Gantt chart supports multiple zoom levels and navigation modes so you can view anything from an hourly breakdown of a two-week lookahead to a multi-year programme overview. The timescale header uses a configurable two-tier layout that adapts automatically to your zoom level.

Zoom Levels

Kazinex provides six zoom presets. Switch between them using the zoom controls in the Gantt toolbar or with keyboard shortcuts.

Zoom LevelPixels/DayMajor HeaderMinor HeaderBest For
Hour480Day (dd MMM)Hour (HH:mm)Detailed daily planning
Day30Week (dd MMM)Day (dd)Weekly lookahead
Week (default)15Month (MMM yyyy)Week (dd)General project review
Month3Quarter (Qo yyyy)Month (MMM)Programme-level overview
Quarter1Year (yyyy)Quarter (Qo)Multi-year programmes
Year0.25Year (yyyy)Year (yyyy)Portfolio timelines

Two-Tier Timeline Headers

The timeline header displays two rows of labels. Choose from five tier configurations:

Tier ModeTop RowBottom RowSuggested Use
Year / QuarterYearsQuartersMulti-year programmes
Year / Month (default)YearsMonths1–3 year projects
Quarter / MonthQuartersMonths6–18 month programmes
Month / WeekMonthsWeeks3–12 month projects
Week / DayWeeksDay initials1–3 month lookahead

Change the tier mode in Gantt Settings → Timescale.

Toolbar Buttons

ControlAction
Zoom In (+)Move to the next finer zoom level
Zoom Out (−)Move to the next coarser zoom level
Fit to WindowAdjust zoom so all activities fit in the visible area
Go to Data DateScroll the chart to centre on the project data date
Go to TodayScroll the chart to centre on today's date

Mouse & Touch

ActionBehaviour
Scroll wheelVertical scroll (synchronised with the grid)
Shift + Scroll wheelHorizontal scroll (pan the timeline)
Ctrl + Scroll wheelZoom in / out at the cursor position
Click + Drag (background)Pan the chart in any direction
Pinch (touch)Zoom gesture on touch-enabled devices

Keyboard Shortcuts

ShortcutAction
Ctrl + =Zoom in
Ctrl + −Zoom out
Ctrl + 0Reset to default zoom (Week)
HomeScroll to the earliest activity
EndScroll to the latest activity
Ctrl + GGo to Data Date

Split-Pane Navigation

In Split view mode, the grid and Gantt share a synchronised vertical scroll. Each pane has its own horizontal scrollbar. Drag the centre divider to resize panes (minimum 260 px each side). Double-click the divider to reset to a 50/50 split.

Viewport & Date Range

The visible date range (viewport) is determined by your zoom level and the current scroll position. Kazinex calculates data bounds from your schedule's earliest and latest dates and uses those as the natural scroll limits.

Tips & Best Practices

  • Use Fit to Window when you first open a schedule to see the full timeline
  • Switch to Week / Day tier mode for detailed look-ahead analysis
  • Use Ctrl + scroll to zoom into a specific area of interest
  • Press Ctrl + G to quickly jump back to the data date after navigating

Troubleshooting

ProblemCauseSolution
Chart appears blankViewport is outside the schedule date rangeClick Fit to Window or press Home
Bars are tiny dotsZoom level too coarse for the project durationZoom in, or use a finer zoom preset
Timeline labels overlapZoom too fine for the visible area widthZoom out one level
Scroll not synchronisedSplit-pane scroll can de-sync after resizeClick any row to re-sync