Audit a Completed Workflow

Workflow audit trail

This tutorial covers how to read, navigate, filter, and export the audit trail for a completed workflow. Use it when a project manager, document controller, quality lead, or external auditor needs to verify how a document moved through its review process.

Role: Document Controller, Project Admin, or Quality Lead
Prerequisite: At least one completed workflow in the project.


Why audit workflows?

The audit trail provides:

  • Legal and contractual protection — evidence that required reviews were completed by the right people at the right time.
  • Quality assurance — verification that all reviewers responded and no steps were bypassed.
  • Dispute resolution — a timestamped record of every decision, comment, and file version.
  • Closeout evidence — the document package that demonstrates the project met its review obligations.

Step 1 — Navigate to the completed workflow

  1. Go to Workflows in the left sidebar.
  2. The default view shows Active workflows. Switch the filter to Completed.
  3. Search by document number or title to find the specific workflow.
  4. Click the workflow row to open the workflow instance detail.

Alternatively:

  1. Navigate to Documents and find the document in the register.
  2. Click the document to open its detail view.
  3. Select the Activity tab to see all events for this document, including the workflow history.
  4. Click View Workflow next to the completed workflow entry.

Step 2 — Read the workflow header

At the top of the workflow instance detail, you will see:

FieldWhat it shows
DocumentDocument number, title, and revision that was reviewed.
TemplateThe workflow template used, including the version in effect at start time.
Started byThe user who initiated the workflow, with timestamp.
CompletedThe date and time the final step was completed.
DurationTotal calendar days from start to completion.
Final decisionThe cumulative outcome: Approved, Rejected, Returned, or Completed.
StatusShould show Completed for a closed workflow.

Step 3 — Read the step progress bar

The horizontal step progress bar shows all steps with their completion status:

  • Green check (✓) — step completed with a positive decision (Approve, Acknowledge, Sign).
  • Red X — step completed with a negative decision (Reject, Return for Revision).
  • Grey (with completion date) — step completed; neutral or informational action.
  • All steps should be in a resolved state (no blue/active steps) for a completed workflow.

Click any step in the progress bar to expand its detail panel.


Step 4 — Review each step’s detail

For each step, the detail panel shows:

FieldWhat to look for
Step typeReview, Approve, Acknowledge, or Sign.
AssigneeThe user assigned to this step at the time it was active.
Due dateThe step’s configured deadline.
RespondedThe timestamp when the assignee submitted their response.
Response actionThe decision submitted: Approve, Approve with Comments, Reject, etc.
On time / LateWhether the response was submitted before or after the due date.
CommentsAny comments submitted with the response.
AttachmentsAny marked-up files or supporting documents attached.

For quality assurance, verify:

  • All required assignees responded (no No Response entries unless auto-close was intentional and documented).
  • All Approve with Comments responses have non-empty comment threads.
  • All Reject or Return for Revision responses have a comment explaining the issue.
  • Response timestamps are within the expected date range for the project.

Step 5 — Filter the audit event list

Below the step panels, the full Audit Event Log shows every system event for this workflow instance:

Event typeDescription
workflow_startedWorkflow was initiated by a user.
step_activatedA step became active (assignee was notified).
step_response_submittedAssignee submitted a response.
step_reassignedStep assignee was changed by an admin.
step_due_date_changedStep due date was extended by an admin.
comment_addedA comment was added to a step.
attachment_addedA file was attached to a step.
step_escalatedAn overdue notification was sent.
workflow_completedFinal step completed; workflow reached terminal state.
workflow_cancelledWorkflow was cancelled by an admin.

Filter the event log by:

  • Event type — use the Type dropdown to see only responses, only comments, etc.
  • Date range — narrow to a specific period.
  • Actor — filter to events performed by a specific user.

Step 6 — Verify comments and attachments

  1. Click each step that shows Approve with Comments or Reject.
  2. Expand the Comments section to read the full comment text.
  3. Check Attachments for any marked-up files provided by the reviewer.
  4. If required by your governance process, download each attachment and store it in the project archive system.

Step 7 — Check linked records

From the workflow instance detail, also verify:

  • Document status — click the document link at the top to confirm the current document status matches the workflow outcome.
  • Transmittals — if the document was transmitted after approval, link to the transmittal from the document’s Activity tab.
  • Revision history — if a revision was uploaded mid-workflow (due to a Return for Revision request), confirm the revision chain is complete.

Step 8 — Export the audit report

To produce a compliance-ready audit record:

  1. Click Export Audit Report at the top right of the workflow instance detail.
  2. Choose format: PDF (for human review and archiving) or Excel (for data analysis).
  3. The PDF export includes:
    • Workflow header (document, template, dates, final decision)
    • Step summary table (step, assignee, due date, response date, action, on-time status)
    • Full comment and attachment list per step
    • Complete event log with timestamps and actors
  4. Save the export to your project document management system or share with the auditor.

What complete audit evidence includes

A fully compliant audit record demonstrates:

  • The correct document and revision was reviewed.
  • The correct template (matching the project review plan) was used.
  • All required step assignees submitted responses.
  • All decisions are recorded with the actor’s name and timestamp.
  • All comments and attachments are preserved.
  • The final document status matches the workflow outcome.
  • No unexplained gaps in the event log.