Skip to main content

Work Package Reporting

Work package reporting gives project managers visibility into delivery progress — which packages are on track, which are overdue, and what evidence exists for close-out.

The Work Packages list view

The main Work Packages tab shows all packages in a filterable list:

ColumnContent
TitlePackage name and reference
Assigned ToResponsible member
StatusCurrent lifecycle status with colour badge
Due DateTarget completion date
DocumentsCount of linked documents
WorkflowsCount of linked workflow instances (with active count)
OverdueRed badge if past due date and not yet closed

Filtering the list

FilterOptions
StatusOpen / In Progress / Submitted / Returned / Approved / Closed
Assigned ToFilter to a specific team member
Overdue onlyShow only packages past due date
Date rangeFilter by due date range
SearchFree-text search on title and reference

Progress summary

At the top of the Work Packages tab, a progress summary shows:

  • Total packages by status (stacked bar or count cards)
  • Packages overdue count
  • Packages due this week

This gives a quick-scan overview before drilling into individual packages.

Generating a work package report

For a formal progress report:

  1. Go to ReportsNew Report.
  2. Select metric: Work Package Summary (if available) or use Workflow Count filtered to work-package-linked workflows.
  3. Group by Status to see the status distribution.
  4. Export to Excel.

Alternatively, use the Work Packages list Export button:

  1. Apply your desired filters (e.g. status = In Progress or Overdue).
  2. Click ExportExcel.
  3. The export includes all visible columns and package metadata.

Tracking close-out evidence

For packages in Submitted or Approved status, verify close-out evidence is attached:

  1. Open the package.
  2. Check the Documents list — close-out evidence should be present (signed inspection record, test certificate, etc.).
  3. Check the Workflows list — all linked approval workflows should show Completed.

If evidence is missing, click Return with a note requesting the missing document before approving.

Common reporting scenarios

ScenarioHow
Weekly delivery progress updateExport filtered list (status ≠ Closed) to Excel
Overdue package escalation reportFilter: Overdue = Yes → Export
Close-out package auditFilter: Status = Approved → verify documents and workflows in each
Team workload viewFilter by Assigned To → group by status

What's next