Creating Work Packages

Work packages group related documents and workflows under a single deliverable unit — a construction package, a design submittal set, or a commissioning milestone. This guide explains every field and option when creating a work package.

Opening the create form

  1. Navigate to the Work Packages tab.
  2. Click New Work Package.

Fields

Header fields

FieldTypeRequiredDescription
TitleTextYesDescriptive name for the package (e.g. "Level 3 — Structural Drawings Package")
ReferenceTextNoPackage code from your project WBS or contract schedule (e.g. WP-STR-L3-001)
DescriptionText areaNoWhat this package contains, its scope, or any special instructions
PriorityDropdownNoLow / Normal / High / Critical — drives visual highlighting and sort order

Assignment and dates

FieldTypeRequiredDescription
Assigned ToUser pickerNoThe team member responsible for delivering this package — receives overdue notifications
Due DateDateNoWhen the package must be complete. Packages past this date show in Overdue alerts.
Start DateDateNoWhen work on the package is expected to begin

Documents

  1. Click Add Documents.
  2. The document picker opens — search or browse the register.
  3. Select one or more documents to include in this package.
  4. Click Add Selected.

Documents appear in the Documents list with their current status. Adding a document to a work package does not change its status — it is a reference link only.

You can add documents from multiple disciplines or zones to a single work package. Documents can belong to multiple work packages.

Linked workflows

You can link existing workflow instances to the work package (or start new ones from the work package):

  1. Click Link Workflow → search for an existing workflow instance.
  2. Or click Start Workflow → select a template → the new workflow is automatically linked to this package.

Linked workflows appear in the Workflows list with their current status and assignee.

Saving and status

  1. Click Create Work Package.
  2. The work package is created with Open status.
  3. It appears in the Work Packages tab list, assigned to the selected member (if any).

Editing after creation

Open the work package → click Edit to modify any field, add/remove documents, or update the due date. Status transitions are covered in the Work Package Lifecycle guide.