Work Packages Tab

The Work Packages tab provides the project-level view of all defined packages — their current status, document composition, and review progress. Unlike the register view which shows individual documents, the Work Packages tab shows aggregated progress at the package level, making it easier for project managers to track submittal completion without needing to inspect every document individually.

Workflows work package detail

Package list view

The main view lists all packages for the active project:

ColumnDescription
Package numberUnique reference identifier for the package.
TitleDescriptive name of the package.
StatusCurrent status: Draft, Active, Submitted, or Closed.
DisciplinePrimary discipline the package covers.
ResponsibleTeam member accountable for the package.
DocumentsTotal count of documents assigned to the package.
ApprovedCount of documents in Approved or Approved with Comments status.
Under reviewCount of documents currently in an active workflow.
Target dateExpected submission date. Past-due packages are highlighted.

Package detail view

Click any package row to open its detail view:

Status summary cards

At the top of the detail view, summary cards show:

  • Total documents in the package
  • Documents by status (Approved, Under Review, For Review, Draft, Rejected)
  • Overall package progress as a percentage (based on documents in Approved status)

Document list

All documents assigned to the package are listed with:

  • Document number, title, revision, and discipline
  • Current status with status badge
  • Active workflow name (if any) with a link to open the workflow
  • Owner and due date

Filtering within a package

Apply filters to the document list within a package:

  • Status
  • Discipline
  • Document type
  • Owner
  • Active workflow (yes/no)

Package status progression

StatusWho can set itNotes
DraftAuto (on creation)Documents can be added or removed freely.
ActiveProject admin, Document controllerSignals production is underway.
SubmittedDocument controllerRecords the formal issue date.
ClosedProject adminLocks the package. Documents remain in the register but can no longer be added.

Bulk actions from the tab

ActionSteps
Start workflow on all documentsSelect the package → Actions → Start workflow. Choose a template; all documents in the package are routed simultaneously.
Export document listSelect the package → Export → Excel or PDF. Produces a transmittal-ready document schedule.
Move package to SubmittedSelect the package → Actions → Mark as Submitted. Sets the submission date to today.

Creating a new work package

  1. Click New Package in the top right of the Work Packages tab.
  2. Enter a Package Number (auto-populated from the numbering scheme) and Title.
  3. Set the Responsible team member.
  4. Set the Target Date.
  5. Optionally set the Discipline scope.
  6. Save. The package is created in Draft status.
  7. Add documents from the register using the Add Documents button on the package detail view.

Package status transitions

Draft → Active → Submitted → Closed
└─ (if review fails) → Active (return to active)
  • Draft packages can have documents added or removed freely.
  • Active signals that the package is in production or under review.
  • Submitted records the formal submission date and locks the document list.
  • Closed locks the package entirely; documents remain in the register but cannot be added.