Project Generation

Applies to: Free · Pro · Enterprise Last updated: 08-Jun-2026

Overview

The AI Copilot can generate complete project schedules from scratch using industry-specific templates. Choose from 10 project types, specify a duration and scope, and the AI builds a full schedule with WBS hierarchy, activities, durations, relationships, milestones, and calendars — ready to use or export.

Industry Templates

TemplateType IDTypical Duration
EPC (Engineer, Procure, Construct)epc36 months
Design & Builddesign_build24 months
Constructionconstruction18 months
Renovationrenovation12 months
Infrastructureinfrastructure24 months
Oil & Gasoil_gas36 months
Residentialresidential12 months
Commercialcommercial24 months
Industrialindustrial18 months
Fit-Out / Interiorfit_out6 months

Generation Tiers

Quick Generate (~30 seconds)

The fastest option. Select a project type and total duration, and the AI generates a complete template schedule.

  1. Open the AI Copilot panel.
  2. Click the AI Wizard button on the welcome screen, or type a prompt like:
    "Generate a 12-month residential project"
  3. The AI creates the schedule with industry-standard WBS, activities, and relationships.

Guided Generation (~2–5 minutes)

Describe your project scope in natural language, and the AI builds a customised schedule.

Example prompt:
"Create a 24-month commercial office tower with 30 floors, including MEP, façade, and fit-out phases. Medium complexity."

The AI analyses your description and generates a tailored WBS and activity structure.

Document-Driven Generation (~10–15 minutes)

Upload contract documents or a bill of quantities (BOQ), and the AI extracts key information to build the schedule.

What it extracts:

  • Contractual dates and milestones
  • Scope quantities from BOQ line items
  • Duration estimates based on quantities × production rates

Parameters

ParameterRequiredDescription
Project TypeYesOne of the 10 industry templates
Project NameYesName for the generated project
Total Duration (months)YesOverall project duration
ScopeNoFree-text description of the project scope
ComplexityNolow, medium, or high — affects WBS depth and activity count

What Gets Generated

A generated project includes:

  • WBS hierarchy — industry-standard breakdown (e.g., Mobilisation → Civil Works → Structural → MEP → Commissioning for EPC)
  • Activities — with realistic durations based on template defaults and production rates
  • Relationships — FS, SS, FF, and SF dependencies reflecting standard construction logic
  • Milestones — project start and finish milestones at minimum
  • Calendars — standard working calendar for the project

Regional Cost Rates

The AI supports six regional production rate databases for duration estimation:

RegionDescription
Middle EastGCC-specific rates and local practices
North AmericaUS/Canada standard rates
EuropeEU standard rates
Asia PacificRegional rates for APAC markets
AfricaLocal market rates
South AmericaRegional rates for LATAM

Review Steps

After the AI generates a project, you can review it step by step:

  1. WBS Review — examine the work breakdown structure
  2. Activities Review — check activity names, durations, and types
  3. Relationships Review — verify the logic network
  4. Resources Review — review assigned resources (if applicable)
  5. Quality Scoring — run quality checks on the generated schedule
  6. Export — export the finished schedule to XER, MSPDI, or XML

Tips & Best Practices

  • Start with Quick Generate to get a baseline, then refine manually in the Editor.
  • Specify complexity — "high" generates more detail (deeper WBS, more activities), "low" generates a summary-level schedule.
  • Use regional rates — specify your region for more accurate duration estimates (e.g., "Generate an oil & gas project for the Middle East").
  • Run quality checks after generation to ensure the schedule meets DCMA standards.
  • Adjust durations — AI-generated durations are estimates. Refine them based on your project-specific conditions.

Example Prompts

  • "Generate a 6-month fit-out project called 'Level 15 Office Fit-Out'"
  • "Create a high-complexity 36-month EPC project for a gas processing plant in the Middle East"
  • "Build a 12-month renovation schedule with demolition, structural, MEP, and finishes phases"
  • "Generate a simple 18-month infrastructure project — road construction, 5 km"