Column Definitions
Available in: All plans
Last updated: 26-Feb-2026
Overview
The Kazinex activities grid supports 265 columns across 13 categories. This reference documents every column — its name, data type, and description. Use this when configuring the Column Chooser or interpreting data in the grid.
Data Types
| Type | Description | Format Example |
|---|---|---|
string | Text value | A1010, Pour Foundation |
number | Numeric value | 42, 1.5 |
date | Calendar date | 15-Mar-2026 |
duration | Time span (hours or days) | 80h, 10d |
boolean | True/false toggle | ✅ / — |
percent | Percentage value | 85.5% |
cost | Currency amount | $125,000.00 |
Dynamic Columns
Three categories are populated dynamically from your uploaded file:
- Activity Codes — Created from the activity code types defined in P6 (e.g., Area, Phase, Responsibility)
- User Defined Fields (UDFs) — Created from UDF definitions in the XER file
- Predecessors/Successors — Relationship details generated from logic data
These columns appear automatically in the Column Chooser after import.
1. General (20 columns)
Core activity identification and configuration fields.
| Column Name | ID | Data Type | Description |
|---|---|---|---|
| Activity ID | task_code | string | User-visible activity code identifier |
| Activity Name | activity_name | string | Activity name or description |
| Activity Type | activity_type | string | Task type: Task Dependent, Milestone, LOE, etc. |
| Status | status | string | Not Started, In Progress, or Completed |
| Duration Type | duration_type | string | Fixed Duration, Fixed Units, Fixed Units/Time, etc. |
| WBS | wbs_id | number | Work Breakdown Structure identifier |
| Project ID | project_id | number | Project identifier |
| Calendar | calendar_id | number | Calendar assigned to the activity |
| GUID | guid | string | Globally unique identifier |
| Location | location_id | number | Location reference |
| Created | create_date | date | Date the activity was created |
| Modified | update_date | date | Date of last modification |
| Created By | create_user | string | User who created the activity |
| Modified By | update_user | string | User who last modified the activity |
| Priority | priority | string | Top, High, Normal, or Low |
| Review Required | review_flag | boolean | Whether the activity requires review |
| Locked | locked | boolean | Whether the activity is locked for editing |
| Auto Compute Actuals | auto_compute | boolean | Automatically compute actual values |
| Estimate Weight | est_weight | number | Weight used in estimating |
| Percent Complete Type | complete_pct_type | string | How % complete is calculated: Physical, Duration, or Units |
2. Dates (33 columns)
All date-related fields including planned, actual, early/late (CPM), baseline, and constraint dates.
| Column Name | ID | Data Type | Description |
|---|---|---|---|
| Scheduled Dates | scheduled_date_range | string | Early Start → Early Finish range |
| Actual Dates | actual_date_range | string | Actual Start → Actual Finish range |
| Remaining Dates | remaining_date_range | string | Remaining Early Start → Remaining Early Finish range |
| Baseline Dates | baseline_date_range | string | BL Start → BL Finish range |
| Start | start | date | Current start: Actual Start if started, else Early Start |
| Finish | finish | date | Current finish: Actual Finish if complete, else Early Finish |
| Planned Start | planned_start | date | Planned start date |
| Planned Finish | planned_finish | date | Planned finish date |
| Early Start | early_start | date | CPM early start (forward pass) |
| Early Finish | early_finish | date | CPM early finish (forward pass) |
| Late Start | late_start | date | CPM late start (backward pass) |
| Late Finish | late_finish | date | CPM late finish (backward pass) |
| Actual Start | actual_start | date | When work actually started |
| Actual Finish | actual_finish | date | When work actually finished |
| Expected Finish | expected_finish | date | Forecasted completion date |
| Restart Date | restart_date | date | Date to resume suspended work |
| Re-Finish Date | reend_date | date | Adjusted finish for suspended work |
| Remaining Late Start | rem_late_start | date | Late start for remaining work |
| Remaining Late Finish | rem_late_finish | date | Late finish for remaining work |
| Constraint Type | constraint_type | string | Primary constraint (ASAP, ALAP, MSO, MFO, etc.) |
| Constraint Date | constraint_date | date | Primary constraint date |
| Constraint Type 2 | constraint_type2 | string | Secondary constraint type |
| Constraint Date 2 | constraint_date2 | date | Secondary constraint date |
| Suspend Date | suspend_date | date | Date work was suspended |
| Resume Date | resume_date | date | Date work resumed after suspension |
| External Early Start | external_early_start | date | Imposed early start (external constraint) |
| External Late Finish | external_late_finish | date | Imposed late finish (external constraint) |
| Primary Constraint Date | primary_constraint_date | date | Primary constraint date |
| Secondary Constraint Date | secondary_constraint_date | date | Secondary constraint date |
| Anticipated Start | anticipated_start | date | Anticipated start date |
| Anticipated Finish | anticipated_finish | date | Anticipated finish date |
| BL Start | bl_start | date | Baseline start: BL Actual Start if started, else BL Early Start |
| BL Finish | bl_finish | date | Baseline finish: BL Actual Finish if complete, else BL Early Finish |
3. Durations (26 columns)
Duration values, float calculations, and schedule variance metrics.
| Column Name | ID | Data Type | Description |
|---|---|---|---|
| Original Duration | original_duration | duration | Baseline duration in hours |
| Remaining Duration | remaining_duration | duration | Duration left to complete |
| Actual Duration | actual_duration | duration | Actual duration worked |
| At Completion Duration | at_completion_duration | duration | Actual + Remaining duration |
| BL Duration | bl_project_duration | duration | Project baseline duration |
| Variance - BL Duration | variance_bl_project_duration | duration | At Completion - Baseline duration (negative = overrun) |
| Variance - BL Start | variance_start | number | Days difference from baseline start (positive = delayed) |
| Variance - BL Finish | variance_finish | number | Days difference from baseline finish (positive = delayed) |
| Total Float | total_float | duration | Total float in hours |
| Free Float | free_float | duration | Free float (without affecting successors) |
| Remaining Float | remaining_float | duration | Remaining float (Late Finish - Remaining Early Finish) |
| Driving | driving_path | boolean | On driving (critical) path |
| Working Days | working_days | duration | Working days between start and finish (calendar-aware) |
| Calendar Days | calendar_days | duration | Calendar days between start and finish |
| Ahead/Behind Schedule | ahead_behind_schedule | number | Days ahead (positive) or behind (negative) |
| Baseline Variance (Days) | baseline_variance_days | number | Days variance from baseline dates |
| Actual Working Days | actual_working_days | duration | Actual working days elapsed |
| Remaining Working Days | remaining_working_days | duration | Remaining working days to finish |
| Days to Go | days_to_go | number | Calendar days until planned finish |
| Is Critical | is_critical | boolean | Total float ≤ 0 |
| Is Near Critical | is_near_critical | boolean | Float between 0 and 10 days |
| Float Trend | float_trend | string | Increasing, Stable, or Decreasing |
| Criticality Index | criticality_index | number | 0–100 criticality score |
| Driving Path (Enriched) | drivingPath | string | Path label if on driving path |
| Longest Path | longest_path | boolean | Is on the longest path |
| Secondary Float | secondary_float | duration | Float if driving predecessor removed |
4. Percent Complete (43 columns)
All percentage-based progress metrics including physical, duration, cost, and baseline comparisons.
| Column Name | ID | Data Type | Description |
|---|---|---|---|
| Physical % Complete | physical_pct_complete | percent | Manually entered physical progress |
| Duration % Complete | duration_pct_complete | percent | Based on total units (labor + nonlabor) |
| Labor Units % Complete | labor_units_pct_complete | percent | Actual work / target work |
| Nonlabor Units % Complete | nonlabor_units_pct_complete | percent | Actual nonlabor / at completion nonlabor |
| Cost % Complete | cost_pct_complete | percent | Actual cost / at completion cost |
| Expense Cost % Complete | expense_cost_pct_complete | percent | Actual expense / at completion expense |
| Labor Cost % Complete | labor_cost_pct_complete | percent | Actual labor cost / at completion labor cost |
| Material Cost % Complete | material_cost_pct_complete | percent | Actual material cost / at completion material cost |
| Nonlabor Cost % Complete | nonlabor_cost_pct_complete | percent | Actual nonlabor cost / at completion nonlabor cost |
| Units % Complete | units_pct_complete | percent | Actual units / at completion units |
| BL Activity % Complete | bl_project_activity_pct_complete | percent | Expected activity % per baseline at current date |
| BL Duration % Complete | bl_project_duration_pct_complete | percent | BL actual duration / BL total duration |
| BL Cost % Complete | bl_project_cost_pct_complete | percent | BL actual cost / BL total cost |
| BL Performance % Complete | bl_project_performance_pct_complete | percent | BL actual cost / BL target cost |
| BL Labor Cost % Complete | bl_project_labor_cost_pct_complete | percent | BL actual labor cost / BL labor cost |
| BL Nonlabor Cost % Complete | bl_project_nonlabor_cost_pct_complete | percent | BL actual nonlabor cost / BL nonlabor cost |
| BL Material Cost % Complete | bl_project_material_cost_pct_complete | percent | BL actual material cost / BL material cost |
| BL Expense Cost % Complete | bl_project_expense_cost_pct_complete | percent | BL actual expense cost / BL expense cost |
| BL Labor Units % Complete | bl_project_labor_units_pct_complete | percent | BL actual labor units / BL labor units |
| BL Nonlabor Units % Complete | bl_project_nonlabor_units_pct_complete | percent | BL actual nonlabor units / BL nonlabor units |
| BL Units % Complete | bl_project_units_pct_complete | percent | BL actual units / BL total units |
| BL Physical % | bl_project_physical_pct | percent | Baseline physical % complete |
| BL Schedule % | bl_project_schedule_pct | percent | Baseline schedule % complete |
| BL Cost % of Budget | bl_project_cost_pct_of_budget | percent | BL actual cost / BL budgeted cost |
| BL Duration % of Original | bl_project_duration_pct_of_original | percent | BL actual duration / BL original duration |
| BL % Complete Type | bl_project_percent_complete_type | string | Baseline calculation method |
| Variance - BL Activity % | variance_bl_project_activity_pct | percent | Current - baseline activity % (positive = ahead) |
| Variance - BL Duration % | variance_bl_project_duration_pct | percent | Current - baseline duration % |
| Variance - BL Cost % | variance_bl_project_cost_pct | percent | Current - baseline cost % |
| Variance - BL Performance % | variance_bl_project_performance_pct | percent | Current - baseline performance % |
| Variance - BL Labor Cost % | variance_bl_project_labor_cost_pct | percent | Current - baseline labor cost % |
| Variance - BL Nonlabor Cost % | variance_bl_project_nonlabor_cost_pct | percent | Current - baseline nonlabor cost % |
| Variance - BL Material Cost % | variance_bl_project_material_cost_pct | percent | Current - baseline material cost % |
| Variance - BL Expense Cost % | variance_bl_project_expense_cost_pct | percent | Current - baseline expense cost % |
| Variance - BL Labor Units % | variance_bl_project_labor_units_pct | percent | Current - baseline labor units % |
| Variance - BL Nonlabor Units % | variance_bl_project_nonlabor_units_pct | percent | Current - baseline nonlabor units % |
| Variance - BL Units % | variance_bl_project_units_pct | percent | Current - baseline units % |
| Variance - BL Physical % | variance_bl_project_physical_pct | percent | Current - baseline physical % |
| Variance - BL Schedule % | variance_bl_project_schedule_pct | percent | Current - baseline schedule % |
| Variance - BL Cost % of Budget | variance_bl_project_cost_pct_of_budget | percent | Current - baseline cost % of budget |
| Variance - BL Duration % of Original | variance_bl_project_duration_pct_of_original | percent | Current - baseline duration % of original |
| Performance % Complete | performance_pct_complete | percent | Actual cost / target cost |
| % Schedule Complete | percent_schedule_complete | percent | Percentage of schedule duration complete |
5. Units (17 columns)
Labor and nonlabor resource unit quantities.
| Column Name | ID | Data Type | Description |
|---|---|---|---|
| Primary Resource | primary_resource | number | Primary resource identifier |
| Budgeted Labor Units | planned_labor_units | number | Budgeted work hours |
| Remaining Labor Units | remaining_labor_units | number | Work remaining in hours |
| Actual Labor Units | actual_labor_units | number | Work completed in hours |
| Actual This Period Labor | actual_this_period_labor | number | Work this period in hours |
| Budgeted Nonlabor Units | planned_nonlabor_units | number | Budgeted equipment/nonlabor units |
| Remaining Nonlabor Units | remaining_nonlabor_units | number | Equipment remaining |
| Actual Nonlabor Units | actual_nonlabor_units | number | Equipment used |
| Actual This Period Nonlabor | actual_this_period_nonlabor | number | Equipment this period |
| BL Labor Units | bl_project_labor_units | number | Baseline labor units |
| BL Actual Labor Units | bl_project_actual_labor_units | number | Baseline actual labor units |
| BL Remaining Labor Units | bl_project_remaining_labor_units | number | Baseline remaining labor units |
| BL Nonlabor Units | bl_project_nonlabor_units | number | Baseline nonlabor units |
| BL Actual Nonlabor Units | bl_project_actual_nonlabor_units | number | Baseline actual nonlabor units |
| BL Remaining Nonlabor Units | bl_project_remaining_nonlabor_units | number | Baseline remaining nonlabor units |
| Variance - BL Labor Units | variance_bl_project_labor_units | number | At completion - baseline labor (negative = overrun) |
| Variance - BL Nonlabor Units | variance_bl_project_nonlabor_units | number | At completion - baseline nonlabor (negative = overrun) |
6. Costs (42 columns)
All cost fields including budgeted, actual, remaining, at-completion, baseline, and variance values.
| Column Name | ID | Data Type | Description |
|---|---|---|---|
| Budgeted Cost | planned_cost | cost | Total budgeted cost |
| Remaining Cost | remaining_cost | cost | Cost remaining to complete |
| Actual Cost | actual_cost | cost | Actual cost incurred |
| At Completion Cost | at_completion_cost | cost | Estimate at completion (EAC) |
| Cost Variance | cost_variance | cost | Actual - Planned cost |
| Cost % Complete | cost_percent_complete | percent | Actual / Planned cost |
| Planned Value (PV) | planned_value | cost | BCWS — Budgeted cost of work scheduled |
| Earned Value (EV) | earned_value | cost | BCWP — Budgeted cost of work performed |
| Cost Performance Index | cost_performance_index | number | EV / AC (below 1 = over budget) |
| Actual Labor Cost | actual_labor_cost | cost | Actual labor cost incurred |
| Actual Nonlabor Cost | actual_nonlabor_cost | cost | Actual nonlabor cost incurred |
| Actual Material Cost | actual_material_cost | cost | Actual material cost incurred |
| Actual Expense Cost | actual_expense_cost | cost | Actual expense cost incurred |
| Actual Total Cost | actual_total_cost | cost | Total actual cost (all categories) |
| Actual This Period Labor Cost | actual_this_period_labor_cost | cost | Labor cost in current period |
| Actual This Period Material Cost | actual_this_period_material_cost | cost | Material cost in current period |
| Actual This Period Nonlabor Cost | actual_this_period_nonlabor_cost | cost | Nonlabor cost in current period |
| At Completion Labor Cost | at_completion_labor_cost | cost | Projected total labor cost |
| At Completion Nonlabor Cost | at_completion_nonlabor_cost | cost | Projected total nonlabor cost |
| At Completion Material Cost | at_completion_material_cost | cost | Projected total material cost |
| At Completion Expense Cost | at_completion_expense_cost | cost | Projected total expense cost |
| At Completion Total Cost | at_completion_total_cost | cost | Projected total cost at completion |
| Budgeted Labor Cost | budgeted_labor_cost | cost | Planned labor cost |
| Budgeted Nonlabor Cost | budgeted_nonlabor_cost | cost | Planned nonlabor cost |
| Budgeted Material Cost | budgeted_material_cost | cost | Planned material cost |
| Budgeted Expense Cost | budgeted_expense_cost | cost | Planned expense cost |
| Budgeted Total Cost | budgeted_total_cost | cost | Total planned cost |
| Remaining Labor Cost | remaining_labor_cost | cost | Remaining labor cost |
| Remaining Nonlabor Cost | remaining_nonlabor_cost | cost | Remaining nonlabor cost |
| Remaining Material Cost | remaining_material_cost | cost | Remaining material cost |
| Remaining Expense Cost | remaining_expense_cost | cost | Remaining expense cost |
| Remaining Total Cost | remaining_total_cost | cost | Total remaining cost |
| BL Labor Cost | bl_project_labor_cost | cost | Baseline labor cost |
| BL Nonlabor Cost | bl_project_nonlabor_cost | cost | Baseline nonlabor cost |
| BL Material Cost | bl_project_material_cost | cost | Baseline material cost |
| BL Expense Cost | bl_project_expense_cost | cost | Baseline expense cost |
| BL Total Cost | bl_project_total_cost | cost | Total baseline cost |
| Variance - BL Labor Cost | variance_bl_project_labor_cost | cost | At completion - baseline labor cost |
| Variance - BL Nonlabor Cost | variance_bl_project_nonlabor_cost | cost | At completion - baseline nonlabor cost |
| Variance - BL Material Cost | variance_bl_project_material_cost | cost | At completion - baseline material cost |
| Variance - BL Expense Cost | variance_bl_project_expense_cost | cost | At completion - baseline expense cost |
| Variance - BL Total Cost | variance_bl_project_total_cost | cost | At completion - baseline total cost |
7. Lists (8 columns)
Relationship and resource lookup fields.
| Column Name | ID | Data Type | Description |
|---|---|---|---|
| Predecessors | predecessors | string | Comma-separated predecessor activity IDs |
| Successors | successors | string | Comma-separated successor activity IDs |
| Predecessor Details | predecessor_details | string | Predecessors with relationship type and lag |
| Successor Details | successor_details | string | Successors with relationship type and lag |
| Resource IDs | resource_ids | string | Comma-separated resource identifiers |
| Resources | resources | string | Comma-separated resource names |
| Role IDs | role_ids | string | Comma-separated role identifiers |
| Roles | roles | string | Comma-separated role names |
8. Earned Value (42 columns)
Earned value management (EVM) metrics including BCWS, BCWP, CPI, SPI, variances, and forecasts.
| Column Name | ID | Data Type | Description |
|---|---|---|---|
| Budget At Completion | budget_at_completion | cost | Total baseline budget (BAC) |
| Planned Value Cost | planned_value_cost | cost | BCWS — Budgeted Cost of Work Scheduled |
| Earned Value Cost | earned_value_cost | cost | BCWP — Budgeted Cost of Work Performed |
| Actual Cost (EV) | actual_cost_ev | cost | ACWP — Actual Cost of Work Performed |
| BAC - Labor Units | budget_at_completion_labor_units | number | Total baseline labor units |
| PV Labor Units | planned_value_labor_units | number | Planned labor units to date |
| EV Labor Units | earned_value_labor_units | number | Earned labor units based on progress |
| CPI | cost_performance_index_ev | number | EV / AC (below 1 = over budget) |
| CPI - Labor Units | cost_performance_index_labor_units | number | EV labor / actual labor units |
| SPI | schedule_performance_index_ev | number | EV / PV (below 1 = behind schedule) |
| SPI - Labor Units | schedule_performance_index_labor_units | number | EV labor / PV labor units |
| CV | cost_variance_ev | cost | EV - AC (negative = over budget) |
| CV - Labor Units | cost_variance_labor_units | number | EV labor - actual labor units |
| CVI | cost_variance_index | number | CV / EV (% variance from budget) |
| CVI - Labor Units | cost_variance_index_labor_units | number | CV labor / EV labor |
| SV | schedule_variance_ev | cost | EV - PV (negative = behind schedule) |
| SV - Labor Units | schedule_variance_labor_units | number | EV labor - PV labor units |
| SVI | schedule_variance_index | number | SV / PV (% variance from schedule) |
| SVI - Labor Units | schedule_variance_index_labor_units | number | SV labor / PV labor |
| EAC Cost | estimate_at_completion_cost | cost | Projected total cost |
| EAC - Labor Units | estimate_at_completion_labor_units | number | Projected total labor units |
| ETC | estimate_to_complete | cost | Expected remaining cost |
| ETC Labor Units | estimate_to_complete_labor_units | number | Expected remaining labor units |
| VAC | variance_at_completion | cost | BAC - EAC (projected variance) |
| VAC - Labor Units | variance_at_completion_labor_units | number | BAC labor - EAC labor |
| TCPI | to_complete_performance_index | number | (BAC - EV) / (BAC - AC) — required future CPI |
| Accounting Variance | accounting_variance | cost | Cost accounting variance |
| Accounting Variance - Labor Units | accounting_variance_labor_units | number | Labor accounting variance |
| Performance % Complete | performance_percent_complete | percent | % complete for EV calculation |
| Performance % Complete - Labor | performance_percent_complete_labor_units | percent | % complete based on labor units |
| Schedule Variance | schedule_variance | cost | EV - PV |
| Schedule Performance Index | schedule_performance_index | number | EV / PV |
| BCWS | bcws | cost | Budgeted Cost of Work Scheduled |
| BCWP | bcwp | cost | Budgeted Cost of Work Performed |
| SV (alias) | sv | cost | Schedule Variance (BCWP - BCWS) |
| CV (alias) | cv | cost | Cost Variance (BCWP - ACWP) |
| SPI (alias) | spi | number | Schedule Performance Index |
| CPI (alias) | cpi | number | Cost Performance Index |
| EAC (alias) | eac | cost | Estimate at Completion |
| ETC (alias) | etc | cost | Estimate to Complete |
| VAC (alias) | vac | cost | Variance at Completion |
| TCPI (alias) | tcpi | number | To Complete Performance Index |
9. Enhanced Metrics (21 columns)
Calculated and derived metrics computed by Kazinex from raw data.
| Column Name | ID | Data Type | Description |
|---|---|---|---|
| At Completion Labor Units | at_completion_labor_units | number | Projected total work hours |
| At Completion Nonlabor Units | at_completion_nonlabor_units | number | Projected total nonlabor units |
| Activity % Complete | activity_percent_complete | percent | Overall % based on configured type |
| Cost % of Budget | cost_pct_of_budget | percent | Actual / budgeted cost |
| Duration % of Original | duration_pct_of_original | percent | At completion / original duration |
| Schedule % Complete | schedule_pct_complete | percent | Time-based schedule completion |
| Hard Constraint | has_hard_constraint | boolean | Has constraining date restriction |
| Is Milestone | is_milestone | boolean | Activity is a milestone |
| Criticality | criticality_status | string | Critical, Near-Critical, or Normal |
| Critical Path | critical_path_indicator | string | Critical, Near-Critical, or Non-Critical |
| Has Constraints | has_constraints | boolean | Has hard constraints applied |
| Labor Hours | labor_hours | number | Total labor hours assigned |
| Equipment Hours | equipment_hours | number | Total equipment hours assigned |
| Material Cost | material_cost | cost | Total material cost |
| Total Resource Cost | total_resource_cost | cost | Sum of all resource costs |
| Resource Count | resourceCount | number | Number of resources assigned |
| Overallocated | overallocated | boolean | Any resource overallocated |
| Peak Loading % | peak_loading | percent | Peak resource loading percentage |
| Average Loading % | average_loading | percent | Average resource loading percentage |
| WBS Code | wbs_code | string | Work Breakdown Structure code |
| WBS Name | wbs_name | string | Work Breakdown Structure name |
10. Number of Activities (11 columns)
Activity count fields used primarily in grouped/summary rows.
| Column Name | ID | Data Type | Description |
|---|---|---|---|
| Activity Count | activity_count | number | Count of activities in group |
| Resource Assignment Count | activity_resource_assignment_count | number | Count of resource assignments |
| Actual Completed | actual_completed_activities | number | Activities with actual finish |
| Actual In-Progress | actual_in_progress_activities | number | Activities started but not finished |
| Actual Not-Started | actual_not_started_activities | number | Activities without actual start |
| BL Completed | bl_project_completed_activities | number | Should be completed per baseline |
| BL In-Progress | bl_project_in_progress_activities | number | Should be in-progress per baseline |
| BL Not-Started | bl_project_not_started_activities | number | Should not be started per baseline |
| Variance - Completed | variance_completed_activities | number | Actual - BL completed (positive = ahead) |
| Variance - In-Progress | variance_in_progress_activities | number | Actual - BL in-progress |
| Variance - Not-Started | variance_not_started_activities | number | Actual - BL not-started |
11. Activity Codes (Dynamic)
Activity code columns are created dynamically based on the codes defined in your uploaded file. Common P6 activity code types include:
- Area — Geographic or site area
- Phase — Project phase (Design, Procurement, Construction, etc.)
- Responsibility — Team or person responsible
- Discipline — Engineering discipline (Civil, Mechanical, Electrical, etc.)
Each activity code type becomes a column in the grid showing the assigned code value per activity.
12. User Defined Fields (Dynamic)
UDF columns are created from the User Defined Field definitions in your file. UDFs can be of types: Text, Number, Integer, Date, Start Date, Finish Date, Cost, or Indicator.
13. Predecessors / Successors (Dynamic)
Relationship detail columns are generated from the logic data, showing predecessor and successor information with relationship types and lag values.
Summary
| Category | # Columns | Data Types Used |
|---|---|---|
| General | 20 | string, number, date, boolean |
| Dates | 33 | date, string |
| Durations | 26 | duration, number, boolean, string |
| Percent Complete | 43 | percent, string |
| Units | 17 | number |
| Costs | 42 | cost, percent, number |
| Lists | 8 | string |
| Earned Value | 42 | cost, number, percent |
| Enhanced Metrics | 21 | number, percent, boolean, string, cost |
| Number of Activities | 11 | number |
| Activity Codes | Dynamic | string |
| User Defined Fields | Dynamic | varies |
| Predecessors/Successors | Dynamic | string |
| Total | 265+ |